logo    

parker fieldhouse

line decor
 
line decor
 
 
 
 

 
 
DESIGN/BUILD
REPRESENTATIVE PROJECTS
Trex

T-REX Design-Build (Colorado Blvd. to South of the Evans Interchange)

Hartwig & Associates was the Area Manager and Civil Design Lead for Segment 1.3, Colorado Blvd. to south of the Evans Interchange, on the I-25 Reconstruction Design-Build project (T-REX). This work included reconstructing I-25 from approximately Steele Street to south of the Evans Avenue Interchange, and the reconstruction of the Colorado Blvd. Interchange, the Evans Avenue Interchange, and improvements on the local arterials and collector streets.

cosmix

COSMIX

Hartwig & Associates was a subconsultant to Rockrimmon Constructors on the I-25 Design-Build project in Colorado Springs. Hartwig & Associates was responsible for the construction phasing and traffic control plans.

 

ROADWAY

STRUCTURES

TRAFFIC ENGINEERING

NEPA/ENVIRONMENTAL/STUDIES

TRANSIT DESIGN

PARKING LOTS/PEDESTRIAN/BIKE TRAILS

CONSTRUCTION MANAGEMENT