logo    

tallman gulch

line decor
 
line decor
 
 
 
 

 
 
PARKING LOTS/PEDESTRIAN/ BIKE TRAILS
REPRESENTATIVE PROJECTS
Newlin

Newlin Gulch Trail

Hartwig & Associates prepared design and construction documents for the Town of Parker for connecting the Newlin Gulch Trail under Lincoln Avenue. This project includes a low water crossing of Newlin Gulch located approximately 600 feet east of Jordan Road and will provide a connection from this trail to the Stonegate neighborhood.

Tallman

Tallman Gulch Trail

Hartwig & Associates prepared design and construction documents for connecting the Tallman Gulch Trail north of Hilltop Road to the existing constructed trails at the Hidden River and Idlewilde subdivisions. The trail consists of approximately 1500 feet of trail and 200 feet of retaining walls to minimize the encroachment into Tallman Gulch.

Sulphur Gulch

Sulphur Gulch Trail

Hartwig & Associates prepared design and construction documents to provide a pedestrian connection along the west side of Parker Road across Sulphur Gulch.

ROADWAY

STRUCTURES

TRAFFIC ENGINEERING

NEPA/ENVIRONMENTAL/STUDIES

TRANSIT DESIGN

CONSTRUCTION MANAGEMENT

DESIGN/BUILD