Hartwig & Associates performed the final design and construction documents for the proposed improvements on Bear Dance Drive. The proposed improvements included horizontal and profile modifications, a roundabout intersection, grading and drainage improvements, and the addition of a guardrail. |
 |
Hartwig & Associates was the Area Manager and Civil Design Lead for Segment 1.3, Colorado Blvd. to south of the Evans Interchange, on the I-25 Reconstruction Design-Build project (T-REX). This work included reconstructing I-25 from approximately Steele Street to south of the Evans Avenue Interchange, and the reconstruction of the Colorado Blvd. Interchange, the Evans Avenue Interchange, and improvements on the local arterials and collector streets. |